|
(Photo courtesy of Commissioner Cynthia Ruiz)
Before descending the tunnel shaft, Jen and I are getting all connoisewer at the humongous concrete slabs used to support the tunnel, almost 11 feet in diameter.
Pictured L-R: Moi, a leader of the construction team, Jen, and city construction inspector Chris Smith.
|
|